Holiday Inn – $13.5M new hotel construction
Brand-standard compliance tracking across a ground-up build with a fixed budget and a fixed deadline
Results: On time, on budget, all corporate standards met
From multifamily and commercial towers to retail, healthcare, and hospitality, owners, operators, developers, architects, contractors, and asset managers across North America use Scope3D to turn existing Revit, BIM, and construction files into a live, AI-readable 3D twin. Explore how each team made their building one model to design, scope, price, plan projects, and run the building from.
Embassy Grand was transforming its flagship event spaces — ballroom, banquet suites, and pre-function areas — while still booking weddings and corporate events throughout construction. Eight specialized trades needed to hand off spaces on a rolling calendar, with zero tolerance for visible disruption on event days.
How the team used Scope3D:
Built a live digital twin from the venue's existing drawings within 72 hours
Gave venue operations a room-by-room view of which spaces were under construction vs. event-ready
Linked AV, millwork, and lighting punch items directly to each suite in the twin
What changed:
Delivered on time — 100% — with zero event cancellations due to construction
15% under budget at project close
98% client satisfaction — highest-rated renovation in the venue group's history
"We ran the entire Embassy Grand renovation on Scope3D as our shared 3D model. It kept every scope and trade aligned, so we stayed operational throughout and delivered a world-class facility that has significantly increased our booking rates."
"We ran the entire Embassy Grand renovation on Scope3D as our shared 3D model. It kept every scope and trade aligned, so we stayed operational throughout most of the project and delivered a world-class facility that has significantly increased our booking rates."
Convention Centre — Toronto, ON
Every project is different. Here are three more teams that ran their building on a 3D twin with Scope3D — from ground-up commercial builds to phased renovations and mixed-use towers.
Brand-standard compliance tracking across a ground-up build with a fixed budget and a fixed deadline
Results: On time, on budget, all corporate standards met
Complex MEP coordination across a dense urban site — LEED certification required full traceability from every trade
Results: LEED Gold achieved, delivered 2 weeks early
Five-floor phased renovation at a fully operational hotel — the team tracked daily zone handoffs in the twin so construction never overlapped with occupied rooms
Results: Zero guest complaints, early floor completions
See how Scope3D performs on your building. Send a Revit, BIM model, or drawings and have a live 3D twin ready in under 24 hours.